Wind Energy

Cloosh Valley, County Galway

Location
25km Northwest of Galway City, County Galway, Ireland.
Site Description
The resource assessment identified wind speeds of 8.9m/s, at a hub height of 65m.
Permit Status
A consultant is currently undertaking an Environmental Impact Study and Planning Permission Application.
Potential Facility Size
100MW
Project Overview
Finavera Renewables selected the site on the basis of high and consistent wind speeds and close proximity to the grid, since the Electricity Supply Board (ESB) plans to be build a new 110kV line from Galway through the site. In relation to planning approval, the Department of the Environment, Heritage and Local Government has issued new planning guidelines to fast track wind farm development in Ireland. These will decrease the time required for environmental impact assessment and planning approval.
A Cloosh Valley Site Map has been produced for this project, which provides a detailed look at where the site is located.
A Cloosh Valley Turbine Layout Map has been produced for this project, which provides a detailed look at where wind turbines could potentially be located.