Wind Energy: Bullmoose

Location
BC Peace Region. 26km West of Tumbler Ridge.
Site Description
Excellent flat, long ridges. The average elevation of the ridge is approximately 1900m. The mean wind speed across the site at a hub height of 65m is expected to range between 9.0 m/s and 10.0 m/s.
Permit Status
Granted Investigative Use Permit (IUP) with Integrated Land Management Bureau (ILMB), British Columbia Ministry of Agriculture and Lands. Granted ILMB License of Occupation for meteorological towers to test wind resource. Meteorological tower erected September, 2006. Wind data collection continues.
Potential Facility Size
Estimated at 112 MW, consisting of approximately 56 wind turbines.
Project Overview
Finavera Renewables is focusing its initial efforts in British Columbia on the Peace Region. The wind resource in this area is strong, and the potential for wind power projects is substantial. Several project sites are being developed simultaneously, with the permitting and planning process ongoing. Finavera Renewables is focusing several projects for inclusion in the 2007 BC Hydro call for power.

For more project information, please contact us:

E-Mail: peacewind@finavera.com
Toll Free Project Information Line: 1 877 280 9051

1111 West Georgia St, 24th Floor
Vancouver, British Columbia
V6E 4M3
604-288-9051